Transporting The Structure to the Location
At the third and final stage the structure is being transported to the client’s location by a truck and placed on top of the infrastructure prepared in advance.
Immediately after placing the structure the units are being connected, from electricity and sanitary installation to the last carpentry details. When the unit is ready, you wouldn’t feel the difference between the conventional construction methods to our advanced techniques.
You’ll be able to enter the structure within 40 days.