close-form

We take care of all the steps in the construction of your building

Talk to us and we will start the process

    3rd Stage – The Structure Arrives

    date 25 בJuly 2019
    date 25 בJuly 2019

    Transporting The Structure to the Location

    At the third and final stage the structure is being transported to the client’s location by a truck and placed on top of the infrastructure prepared in advance.

    Immediately after placing the structure the units are being connected, from electricity and sanitary installation to the last carpentry details. When the unit is ready, you wouldn’t feel the difference between the conventional construction methods to our advanced techniques.

    You’ll be able to enter the structure within 40 days.

    Contact Us – Receiving a price quote for a private house built by our advanced methods.

    image
    לחץ להגדלה